Disciplines
Heavy Lift
Installations
Design Build
Projects
About Dynamic
Contact Us
Call Office

Dynamic

Disciplines
Heavy Lift
Installations
Design Build
Projects
About Dynamic
Contact Us
Call Office
DSC07073.jpg

Projects

Featured
Oil & Gas - Tug Berth Basin Piles
Oil & Gas - Tug Berth Basin Piles

Dynamic were contracted to transport and install 18 piles, each weighing 51 Tonne and measuring 1.524 M diameter x 50 M long.

Read More →
Port of Seattle - Crane Transportation and Demolishment
Port of Seattle - Crane Transportation and Demolishment

The Dynamic Beast mobilized down to the Port of Seattle for the load-out and transportation of two 890MT container cranes.

Read More →
Neptune Bulk Terminal
Neptune Bulk Terminal

Dynamic were contracted to execute critical works for Neptune Bulk Terminals (NBT)

Read More →
Emergency Response Crane Removal Heavy Lift - Port Of Vancouver
Emergency Response Crane Removal Heavy Lift - Port Of Vancouver

In the Winter of 2019 Dynamic was contracted to decommission a damaged container crane at the Port of Vancouver, within 5 hours of the initial call The Dynamic Beast, together with the crew, were mobilized and on site.

Read More →
Pre-cast install 6.jpg
Pile Cap Design

When faced with the challenge of installing several large monopiles for a port upgrade, Dynamic decided to approach the problem differently.

Read More →
design-build-agt-vancouver.jpeg
AGT Balance Of Plant

Dynamic was contracted by Alliance Grain Terminal (AGT) to upgrade existing bulk material facilities upstream of a newly installed 2000 metric-tonne-per-hour ship-loading system.

Read More →
DSC07286-(1).jpg
AGT Shiploader Installation

In conjunction with the AGT Balance of Plant project Dynamic was commissioned, together with EMS Tech, to assist AGT with the complete demolition and installation of the new ship loading system.  

Read More →
johnson street bridge project.jpg
Johnson St. Bridge

Consisting of 3 different phases The Dynamic Beast was instrumental to the success of the Johnson Bridge project.  

Read More →
viterra.jpg
Viterra Pacific Shiploader Project

Dynamic was contracted by EMS Tech Inc. to install a new 2800 metric tonne per hour travelling shiploader.  Considerable efforts were made aligning rails prior to installation for The project saw Dynamic crews erect a transfer and drive tower

Read More →
400T Tug Boat Roll On.jpg
400 Ton Tug Roll On and Lift Off

In the Spring of 2018 DYNAMIC was contracted to pickup and launch two new build tug boats for Island Tug and Barge.

Read More →

HEAVY LIFT | INSTALLATIONS | DESIGN BUILD

Back to Top
Dynamic Installations, 1556 Kebet Way, Port Coquitlam, BC, V3C 5M5, Canada+1-604-464-7695info@dynamic.global
 

Built and Powered by LYFTOFF