Gavin Head
January 9, 2024
Heavy Lift

Oil & Gas - Tug Berth Basin Piles

Gavin Head
January 9, 2024
Heavy Lift
Oil & Gas - Tug Berth Basin Piles

Dynamic were contracted to transport and install 18 piles, each weighing 51 Tonne and measuring 1.524 M diameter x 50 M long.

Gavin Head
February 24, 2021
Heavy Lift

Port of Seattle - Crane Transportation and Demolishment

Gavin Head
February 24, 2021
Heavy Lift
Port of Seattle - Crane Transportation and Demolishment

The Dynamic Beast mobilized down to the Port of Seattle for the load-out and transportation of two 890MT container cranes.

Gavin Head
February 17, 2021
Heavy Lift

Neptune Bulk Terminal

Gavin Head
February 17, 2021
Heavy Lift
Neptune Bulk Terminal

Dynamic were contracted to execute critical works for Neptune Bulk Terminals (NBT)

Michael Rothwell
March 20, 2019
Heavy Lift

Emergency Response Crane Removal Heavy Lift - Port Of Vancouver

Michael Rothwell
March 20, 2019
Heavy Lift
Emergency Response Crane Removal Heavy Lift - Port Of Vancouver

In the Winter of 2019 Dynamic was contracted to decommission a damaged container crane at the Port of Vancouver, within 5 hours of the initial call The Dynamic Beast, together with the crew, were mobilized and on site.

Michael Rothwell
October 3, 2018
Design Build

Pile Cap Design

Michael Rothwell
October 3, 2018
Design Build

When faced with the challenge of installing several large monopiles for a port upgrade, Dynamic decided to approach the problem differently.

Michael Rothwell
September 23, 2018
Design Build

AGT Balance Of Plant

Michael Rothwell
September 23, 2018
Design Build

Dynamic was contracted by Alliance Grain Terminal (AGT) to upgrade existing bulk material facilities upstream of a newly installed 2000 metric-tonne-per-hour ship-loading system.

Michael Rothwell
September 14, 2018
Heavy Lift, Installations

AGT Shiploader Installation

Michael Rothwell
September 14, 2018
Heavy Lift, Installations

In conjunction with the AGT Balance of Plant project Dynamic was commissioned, together with EMS Tech, to assist AGT with the complete demolition and installation of the new ship loading system.  

Michael Rothwell
September 14, 2018
Heavy Lift

Johnson St. Bridge

Michael Rothwell
September 14, 2018
Heavy Lift

Consisting of 3 different phases The Dynamic Beast was instrumental to the success of the Johnson Bridge project.  

Michael Rothwell
September 5, 2018
Installations

Viterra Pacific Shiploader Project

Michael Rothwell
September 5, 2018
Installations

Dynamic was contracted by EMS Tech Inc. to install a new 2800 metric tonne per hour travelling shiploader.  Considerable efforts were made aligning rails prior to installation for The project saw Dynamic crews erect a transfer and drive tower

Michael Rothwell
September 3, 2018
Heavy Lift

400 Ton Tug Roll On and Lift Off

Michael Rothwell
September 3, 2018
Heavy Lift

In the Spring of 2018 DYNAMIC was contracted to pickup and launch two new build tug boats for Island Tug and Barge.

Michael Rothwell
September 12, 2017
Heavy Lift

MV North Star LNG Conversion

Michael Rothwell
September 12, 2017
Heavy Lift

The Dynamic Beast was commissioned to lift Block A with a weight of 192.6 metric tons and Block B with a weight of 270.2 metric tons as well as the 2 LNG tanks each with an estimated weight of 156 metric tons.

Michael Rothwell
September 5, 2017
Heavy Lift

98KT Electrical Transformer Lift

Michael Rothwell
September 5, 2017
Heavy Lift

Swire Shipping acquired the services of The Beast in order to lift an Electrical Transformer that weighed a mighty 98 tons from the MV Hunan and place it onto the dock at Fraser Surrey Docks.

Michael Rothwell
July 22, 2014
Installations

Kinder Morgan - Mount Milligan

Michael Rothwell
July 22, 2014
Installations

Dynamic Installations was successful in the bid to complete the structural upgrades to the TT128 existing tower at the Kinder Morgan Mt Milligan plant.

Michael Rothwell
September 13, 2010
Installations

Cascadia Terminals

Michael Rothwell
September 13, 2010
Installations

When Cascadia Terminals (now Viterra) needed installation work done on their new dust transportation system one call was all they needed to make.